| Church Doors Project |
|
The road salt that is necessary to ensure safe winter travel on Touhy Avenue has the unfortunate side effect of accelerating deterioration on our adjacent building perimeters. The church doors along Touhy are particularly vulnerable, and Phase One of the project was to replace those doors; that project was completed in early March of 2011. Phase Two is the replacement of the front entrance doors, and if the generosity of our donors permits, the alley doors as well. We share with you below some recent photographs of the church doorways. Clicking any of the photos will enlarge them into a looping slideshow.
View the embedded image gallery online at:
http://stjuliana.org/index.php?option=com_content&view=article&id=106&catid=27&Itemid=128#sigProGalleria4ef75967de
|